Proposed Hydroelectric Power at Broken Bow Reservoir
- Identifier:
- CAC_CC_001_15_9_3_0005
- Contributing Institution:
- Carl Albert Congressional Research and Studies Center, University of Oklahoma, Norman, OK
- Title:
- Proposed Hydroelectric Power at Broken Bow Reservoir
- Date Created:
- 1962-01-01
- EDTF:
- 1962-01-01
- Creator:
- unknown
- Rights:
- http://rightsstatements.org/vocab/NKC/1.0/
- Language:
- eng
- Record Type:
- correspondence
- Collection:
- Carl Albert Collection
- Collection Finding Aid:
- https://arc.libraryhost.com/repositories/3/resources/146
- Description:
- The document consists of correspondence regarding the proposed reports on the Water Quality Study, Arkansas-Red River Basins, Hugo Reservoir, and Broken Bow Reservoir in Oklahoma. The reports discuss the advisability of including hydroelectric-power facilities at Broken Bow Reservoir and recommend modifications to the project to include fish and wildlife conservation and general recreation. The total estimated cost of the project is $39,600,000 for construction, with local interests required to bear costs for water supply. The Board of Engineers for Rivers and Harbors concurs with the recommendations, and the Chief of Engineers supports including hydroelectric-power facilities at Broken Bow Reservoir.
- Policy Area:
- Water Resources Development, Public Lands and Natural Resources
- Topic:
- Water resources development--Law and legislation--United States.
- Congress:
- 87th (1961-1963)
- Physical Location:
- CAC_CC_001_15_9_3_0000, Box 9, Folder 3, University of Oklahoma, Carl Albert Center Archives, Norman, OK, Standard Shelving
- Location Represented:
- United States (nation), District of Columbia (national district), Oklahoma (state)
- Type:
- Text
- Extent:
- 12 Pages