Annual Report of the Chief of Engineers, U.S. Army: Fiscal Year 1967 - Civil Works Activities
- Identifier:
- CAC_CC_001_15_9_3_0001
- Contributing Institution:
- Carl Albert Congressional Research and Studies Center, University of Oklahoma, Norman, OK
- Title:
- Annual Report of the Chief of Engineers, U.S. Army: Fiscal Year 1967 - Civil Works Activities
- Date Created:
- 1967-06-30
- EDTF:
- 1967-06-30
- Creator:
- unknown
- Rights:
- http://rightsstatements.org/vocab/NKC/1.0/
- Language:
- eng
- Record Type:
- correspondence
- Collection:
- Carl Albert Collection
- Collection Finding Aid:
- https://arc.libraryhost.com/repositories/3/resources/146
- Description:
- The document provides a report on the Chief of Engineers, U.S. Army for the fiscal year ended June 30, 1967, focusing on civil works activities related to rivers, harbors, flood control, and beach erosion control. It includes specific project data on the Broken Bow Reservoir in the Red River Basin, Oklahoma, detailing the existing project, authorized work, local cooperation, operations, and results during the fiscal year. The project is 74 percent complete with an estimated cost of $39,600,000.
- Policy Area:
- Public Lands and Natural Resources, Water Resources Development
- Topic:
- Water resources development--Law and legislation--United States.
- Congress:
- 90th (1967-1969)
- Physical Location:
- CAC_CC_001_15_9_3_0000, Box 9, Folder 3, University of Oklahoma, Carl Albert Center Archives, Norman, OK, Standard Shelving
- Location Represented:
- United States (nation), Oklahoma (state), District of Columbia (national district)
- Type:
- Text
- Extent:
- 3 Pages